Piling and slab construction and drainage
Jones Foundations have recently completed the piling and slab construction and drainage for a development of 10 terraced houses for Denne Contruction at Vine Street, Brighton, East Sussex.
150no. 300mm auger bored piles were installed to a depth of 8m to support a reinforced concrete slab which was designed with a thickened edge to support the brickwork.
News Date: 2005-08-18
< main list...